UAE
ADSSC
Dubai
MERAAS
Supply and installation of MEP works for Firefighting and Irrigation pumping Station.
Pump Capacity: 64 l/s @90m head.
Jocky Pump Capacity: 5 l/s @91m head.
Qty of pump: 4 No’s
Saudi Arabia
NWC
Scope: Design, Engineering, Supply installation and testing commissioning DAM water treatment system
Process: Ultrafiltration System.
The whole plant was designed in compact units, including Coagulation & Flocculation tanks , Lamella Clarifiers and Containerized Ultrafiltration Systems
Al ain - Dubai
Specialist agriculture and farm construction company
Feed flow : 12.7 m3/hr (67,099 US GPD)
Recovery : 75%
Permeate flow : 9.5 m3/hr (50,000 US GPD)
Reject flow : 3.2 m3/hr (17,099 US GPD)
Operating hrs : 20 hrs
Source : Bore Well Water
Saudi Arabia
Ministry Of Defence
Design, Engineering, Fabrication and supply of 2 No’s of RO plant of capacity 1135 CMD
Raw water TDS: 12000 ppm
Dubai
MERAAS
Supply and installation of MEP works for Lifting stations & irrigation pumping stations.
Pump Capacity: 55 l/s @24m head.
Qty of pump: 3 No’s
Dubai
MERAAS
Supply, Installation, testing & Commissioning of MEP works in Storm drainage pumping station.
Pump Capacity: 603 l/s @12m head.
Qty of pump: 5 No’s
BAHRAIN
Royal Court Of Bahrain.
Supply, Installation. Testing and Commissioning of 80000 USG sea water RO plant including sea water intake system
Raw water TDS: 60000 ppm
IRAQ
CPECC
Design, Engineering, Fabrication and supply of 1 No’s of containerized RO plant of capacity 10m3/Hr
Raw water TDS: 35000 ppm
UAE
ADSSC